EXTENSION TO THE EXISTING TRAM NETWORK IN CROYDON
PROJECT London Tram – Dingwall Road Loop CLIENT Transport for London SERVICE EIA, ES, traffic and transport, water resources, archaeology, socio economics, noise, air quality, GIS, arboriculture PROJECT PERIOD 2014 - 2017

PROJECT OUTLINE

The Dingwall Road loop was developed closely with LB Croydon to support one of the largest town centre regeneration projects in London.  The development was expected to create over 5,000 permanent local job opportunities and deliver between 400 and 600 new homes, with the number of passengers using the tram network in the area expected to double by 2030. The scheme involved providing a new link to the existing tram network and a new tram stop on Lansdowne Road.

Our Role

Temple undertook the EIA for the Tramtrack Croydon (Dingwall Road Loop) Order which was an extension to the existing tram network in Croydon as part of a Transport and Works Act Order.

39 stops along 17 miles of track
Tram system serving Croydon, and improving transport links in South London and surrounding areas.
Temple